Publicações

Sobral, J. e Ferreira, L. (2015), “Establishment of optimal physical assets inspection frequency based on risk principles”, Maintenance and Reliability, Vol. 17(2), pp. 243-249

Risk Based Inspection (RBI) is a risk methodology used as the basis for prioritizing and managing the efforts for an inspection program allowing the allocation of resources to provide a higher level of coverage on physical assets with higher risk. The main goal of RBI is to increase equipment availability while improving or maintaining the accepted level of risk. This paper presents the concept of risk, risk analysis and RBI methodology and shows an approach to determine the optimal inspection frequency for physical assets based on the potential risk and mainly on the quantification of the probability of failure. It makes use of some assumptions in a structured decision making process. The proposed methodology allows an optimization of inspection intervals deciding when the first inspection must be performed as well as the subsequent intervals of inspection. A demonstrative example is also presented to illustrate the application of the proposed methodology.

Pode descarregar esta publicacao de: http://www.ein.org.pl/sites/default/files/2015-02-11.pdf

Se nao conseguiu obter uma copia desta publicação: Peça uma cópia desta publicação



Para informação sobre todas as publicações do CENTEC pode descarregar: Lista Completa de Publicações do CENTEC